Automated Peak Shaving

Reduce peaks without risking uptime

Avoid demand spikes and capacity violations with automated control actions

Stabilize operations by shifting load within safe temperature and redundancy limits

Create a repeatable peak strategy for normal days and exceptional events

For Technical Facility Managers and Energy Managers responsible for electrical capacity and cooling performance.

Trusted by leading data centers, manufacturers, and energy innovators.

Tagline

Problem / Cost of Inaction

Forerunner™ is more than just a visual system — it’s a launchpad for serious brands ready to scale with elegance and clarity.
Futuristic Vision
Unleash next-level 3D visuals and immersive AI integrations that set your brand apart.
Lightning-Fast Setup
Go live in record time with intuitive tools and streamlined workflows that keep you focused on what matters most.
Adaptive Framework
Seamlessly customize layouts and features to match any style.
Data-Driven Insights
Harness real-time analytics to refine strategies, sharpen messaging.
Ever-Evolving Updates
Stay at the forefront of innovation as we continually refine features to match emerging trends.
Why choose etalytics

What You’ll Get

Discover how AI can unlock real value for your plan. This is a practical, low-commitment way to understand whether AI can make a measurable difference in your plant. Fill out the form to book your free feasibility study now and you’ll gain:

A detailed report tailored to your system
Get a comprehensive analysis of your data center’s cooling infrastructure – including chillers, pumps, cooling towers, and hybrid systems. Identify inefficiencies, bottlenecks, and untapped savings potential, just as realized in the Equinix FR6 project.
Insight into potential energy and cost savings specific to your operations
Receive a clear, data-driven estimate of how much energy and cost can be saved in your facility. Our approach factors in IT load fluctuations, ambient conditions, and safety standards – enabling proven results like 900 MWh/year savings and 240 tCO₂/year reduction.
A clear roadmap to implementing AI safely and effectively
Understand how AI can be integrated step by step into your existing Building Management System (BMS). From data acquisition with IoT gateways to digital twin modeling and optimization control loops, you’ll see exactly how risks are minimized and efficiency is maximized.
Confidence in taking the next step toward smarter energy use
Get actionable insights without obligations. The analysis gives you clarity and confidence – whether you want to replicate proven savings immediately or simply explore the potential for your data center’s future operations.
The steps

How it works

Step 1: Expert Consultation
Meet with our team to discuss your cooling system, goals, and constraints.
Step 2: Feasibility Analysis
We analyze existing data to estimate your optimization potential – no system changes required.
Step 3: Connect and Activate etaONE®
We integrate etaONE® and begin real-time optimization using your infrastructure.
Step 4: Scale Across Sites
After proving results at one site, scale seamlessly across your full portfolio.
Measurable Outcomes

Outcomes & KPIs

21%

Share team inboxes

Whether you have a team of 2 or 200, our shared team inboxes keep everyone on the same page and in the loop.
21%

Deliver instant answers

An all-in-one customer service platform that helps you balance everything your customers need to be happy.
21%

Manage your team

Measure what matters with Untitled’s easy-to-use reports. You can filter, export, and drilldown on the data in a couple clicks.
21%

Connect with customers

Solve a problem or close a sale in real-time with chat. If no one is available, customers are seamlessly routed to email without confusion.
Dashboard mockup
Smarter Energy Management

Use Case Cards

Smart Analytics
Make better decisions, faster. Track performance in real time and gain insights with data-powered visuals baked right into the design.
Adaptive Layout
Every section, your way. Rearrange, resize, or remove with ease — Forerunner™ is built to flex around your content and goals.
AI Collaboration
Work smarter, not harder. Seamlessly integrate AI-assisted elements to enhance personalization and creative speed.
Dynamic Imagery
Design that speaks volumes. Bring your site to life with immersive visuals, fluid animations, and a distinct 3D edge.
Seamless Onboarding
Launch without the learning curve. With intuitive structure and clean documentation, you’ll be building confidently from day one.
AI Collaboration
Work smarter, not harder. Seamlessly integrate AI-assisted elements to enhance personalization and creative speed.
Get Started

Ready to optimize your facility's energy use?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat.

Trusted by operators across data centers and industry:

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FAQ

Quick Answers
to your Questions

How does AI-driven optimization affect uptime and SLA compliance?

etaONE® actively supports uptime and SLA compliance through real-time, predictive control. By continuously stabilizing key parameters—such as supply temperatures—we reduce the risk of system fluctuations that could impact critical operations. Our AI monitors the condition of all major energy assets, enabling predictive maintenance and reducing unplanned downtime. This not only enhances reliability but also extends the lifecycle of key components—all while improving energy efficiency.

How much energy can data centers save with AI-driven cooling optimization?

Clients typically achieve between 20-40% savings in cooling-related energy use, depending on system conditions and baseline efficiency. The platform also supports long-term cost reduction through automated control and predictive logic.

Is AI-based optimization compatible with existing infrastructure in data centers, such as BMS or energy control systems?

Yes. etaONE® integrates seamlessly with existing data center infrastructure—whether it is BMS, PLC, or SCADA systems. We use standard industrial protocols and a software gateway, so no additional hardware or system replacement is required. This allows our AI to connect with your current setup quickly and securely, enabling real-time optimization without disrupting operations. Especially in mission-critical environments, etaONE® adds intelligence without adding complexity.